500 kWp: On-grid Solar System for a factory

On-grid industrial · Casablanca · June 2024

500 kWp: On-grid Solar System for a factory

Site photo coming soon

500 kWp solar plant installed on the roof of a factory in Casablanca: 862 Jinko Tiger Neo 580 W modules on 4 Sungrow SG110CX inverters, grid-tied in self-consumption. Estimated production ≈ 825 MWh/year (1,650 kWh/kWp), avoiding ≈ 578 t of CO₂ per year.

Technical sheet

CityCasablanca
DateJune 2024
TypeOn-grid industrial
SectorIndustrial
Installed capacity500 kWp
Modules862 × Jinko Tiger Neo 580 W
Inverter4 × Sungrow SG110CX (440 kW AC)
Estimated annual production≈ 825 MWh/yr
Specific yield1650 kWh/kWp/yr
CO₂ avoided per year≈ 578 t CO₂/yr

Similar projects

On Grid Solar System: 700 kWpTangier

On Grid Solar System: 700 kWp

Date:
May 2024
Type:
On-grid industrial

Rooftop photovoltaic plant for an industrial unit in Tangier: 1,208 JA Solar 580 W modules (700.6 kWp) on 6 Huawei SUN2000-100KTL inverters, mounted on steel-deck structures with FusionSolar monitoring. The plant runs in self-consumption to cut the bill and the peak demand. Estimated production ≈ 1,121 MWh/year (1,600 kWh/kWp), avoiding ≈ 785 t of CO₂ per year.

700.6 kWp≈ 1121 MWh/yr≈ 785 t CO₂/yr
View project →
15 kW Hybrid System – Bouskoura Ville VerteBouskoura

15 kW Hybrid System – Bouskoura Ville Verte

Date:
May 2026
Type:
Hybrid Residential

Hybrid photovoltaic system for a villa in Bouskoura Ville Verte: 26 Jinko 620 W panels (16.12 kWp) on a Deye 15 kW hybrid inverter with two Dyness 5 kWh lithium batteries. The system maximises self-consumption and provides backup power during outages. Estimated production ≈ 26.6 MWh/year (1,650 kWh/kWp), avoiding ≈ 18.6 t of CO₂ per year.

16.12 kWp≈ 26.6 MWh/yr≈ 18.6 t CO₂/yr
View project →
15 kW Hybrid System – Anfa, CasablancaCasablanca

15 kW Hybrid System – Anfa, Casablanca

Date:
2026
Type:
Hybrid residential

Hybrid photovoltaic system for a villa in Anfa, Casablanca: 26 LONGi 580 W modules (15.08 kWp) on a Deye 15 kW three-phase hybrid inverter with three Dyness 5.12 kWh lithium batteries (15.4 kWh). The system maximises self-consumption and keeps critical loads running during grid outages. Estimated production ≈ 24.9 MWh/year (1,650 kWh/kWp), avoiding ≈ 17.4 t of CO₂ per year.

15.08 kWp≈ 24.9 MWh/yr≈ 17.4 t CO₂/yr
View project →
Request a quote

Tell us about your needs