15 kW Hybrid System – Bouskoura Ville VerteBouskoura

15 kW Hybrid System – Bouskoura Ville Verte

Date:
May 2026
Type:
Hybrid Residential

Hybrid photovoltaic system for a villa in Bouskoura Ville Verte: 26 Jinko 620 W panels (16.12 kWp) on a Deye 15 kW hybrid inverter with two Dyness 5 kWh lithium batteries. The system maximises self-consumption and provides backup power during outages. Estimated production ≈ 26.6 MWh/year (1,650 kWh/kWp), avoiding ≈ 18.6 t of CO₂ per year.

16.12 kWp≈ 26.6 MWh/yr≈ 18.6 t CO₂/yr
View project →
15 kW Hybrid System – Anfa, CasablancaCasablanca

15 kW Hybrid System – Anfa, Casablanca

Date:
2026
Type:
Hybrid residential

Hybrid photovoltaic system for a villa in Anfa, Casablanca: 26 LONGi 580 W modules (15.08 kWp) on a Deye 15 kW three-phase hybrid inverter with three Dyness 5.12 kWh lithium batteries (15.4 kWh). The system maximises self-consumption and keeps critical loads running during grid outages. Estimated production ≈ 24.9 MWh/year (1,650 kWh/kWp), avoiding ≈ 17.4 t of CO₂ per year.

15.08 kWp≈ 24.9 MWh/yr≈ 17.4 t CO₂/yr
View project →
15 kW Hybrid Solar System – EssaouiraEssaouira

15 kW Hybrid Solar System – Essaouira

Date:
2026
Type:
Hybrid Commercial

Hybrid photovoltaic system installed for a company in the Essaouira region: 24 Jinko Solar 635 W panels (15.24 kWp) on a Deye 15 kW three-phase hybrid inverter with two Dyness 5.12 kWh lithium batteries. The system maximises self-consumption and keeps critical loads running during grid outages. Estimated production ≈ 25.1 MWh/year (1,650 kWh/kWp), avoiding ≈ 17.6 t of CO₂ per year.

15.24 kWp≈ 25.1 MWh/yr≈ 17.6 t CO₂/yr
View project →
10 kW Hybrid + 3 HP Solar Pumping – BenslimaneBenslimane

10 kW Hybrid + 3 HP Solar Pumping – Benslimane

Date:
2026
Type:
Hybrid + Solar Pumping

Combined farm installation in Benslimane: a Deye 10 kW hybrid inverter with 16 Jinko 620 W panels (9.92 kWp) and four GEL batteries powering the buildings, plus a 3 HP solar pumping system on a Veichi 2.2 kW drive with 8 × 590 W panels (4.72 kWp). Total 14.64 kWp installed; estimated production ≈ 24.2 MWh/year (1,650 kWh/kWp), avoiding ≈ 16.9 t of CO₂ per year.

14.64 kWp≈ 24.2 MWh/yr≈ 16.9 t CO₂/yr
View project →
15 kW On-Grid Solar System – KhouribgaKhouribga

15 kW On-Grid Solar System – Khouribga

Date:
2026
Type:
On-Grid Residential

Grid-tied photovoltaic system in Khouribga: 24 Jinko 620 W panels (14.88 kWp) on a Huawei 15 kW inverter, designed to maximise self-consumption and cut electricity costs. Estimated production ≈ 25.3 MWh/year (1,700 kWh/kWp on the Khouribga plateau), avoiding ≈ 17.7 t of CO₂ per year.

14.88 kWp≈ 25.3 MWh/yr≈ 17.7 t CO₂/yr
View project →
7 HP Solar Water Pumping – Tifelt FarmTifelt

7 HP Solar Water Pumping – Tifelt Farm

Date:
2026
Type:
Agricultural Solar Pumping

Solar water pumping system for a farm in Tifelt: a 7 HP pump driven by a Veichi 5.5 kW variable-frequency drive and 12 Canadian Solar 720 W panels (8.64 kWp). The system supplies irrigation water with no grid connection or fuel costs. Estimated production ≈ 14.7 MWh/year (1,700 kWh/kWp), avoiding ≈ 10.3 t of CO₂ per year.

8.64 kWp≈ 14.7 MWh/yr≈ 10.3 t CO₂/yr
View project →
15 kWc Residential Installation – Bouskoura VillaBouskoura

15 kWc Residential Installation – Bouskoura Villa

Date:
October 2025
Type:
On-grid residential

Grid-tied photovoltaic system for a villa in Bouskoura: 24 JA Solar 625 W modules (15 kWp) on a Solis 15 kW three-phase inverter, designed to maximise self-consumption. Estimated production ≈ 24.8 MWh/year (1,650 kWh/kWp), avoiding ≈ 17.3 t of CO₂ per year.

15 kWp≈ 24.8 MWh/yr≈ 17.3 t CO₂/yr
View project →
Solar Water Pumping System – Ouled TalebOuled Taleb

Solar Water Pumping System – Ouled Taleb

Date:
July 2025
Type:
Agricultural solar pumping

Solar pumping for a farm in Ouled Taleb: a 7.5 HP submersible pump driven by a Veichi 7.5 kW solar drive and 16 × 590 W modules (9.44 kWp). Irrigation runs with no grid connection and no fuel. Estimated production ≈ 15.6 MWh/year (1,650 kWh/kWp), avoiding ≈ 10.9 t of CO₂ per year.

9.44 kWp≈ 15.6 MWh/yr≈ 10.9 t CO₂/yr
View project →
10 kWc On-Grid Solar InstallationCasablanca

10 kWc On-Grid Solar Installation

Date:
May 2025
Type:
On-grid residential

Grid-tied photovoltaic system for a residence in Casablanca: 16 Jinko 620 W modules (9.92 kWp) on a Huawei SUN2000-10KTL-M1 inverter, in self-consumption. Estimated production ≈ 16.4 MWh/year (1,650 kWh/kWp), avoiding ≈ 11.5 t of CO₂ per year.

9.92 kWp≈ 16.4 MWh/yr≈ 11.5 t CO₂/yr
View project →
500 kWp: On-grid Solar System for a factoryCasablanca

500 kWp: On-grid Solar System for a factory

Date:
June 2024
Type:
On-grid industrial

500 kWp solar plant installed on the roof of a factory in Casablanca: 862 Jinko Tiger Neo 580 W modules on 4 Sungrow SG110CX inverters, grid-tied in self-consumption. Estimated production ≈ 825 MWh/year (1,650 kWh/kWp), avoiding ≈ 578 t of CO₂ per year.

500 kWp≈ 825 MWh/yr≈ 578 t CO₂/yr
View project →
On Grid Solar System: 700 kWpTangier

On Grid Solar System: 700 kWp

Date:
May 2024
Type:
On-grid industrial

Rooftop photovoltaic plant for an industrial unit in Tangier: 1,208 JA Solar 580 W modules (700.6 kWp) on 6 Huawei SUN2000-100KTL inverters, mounted on steel-deck structures with FusionSolar monitoring. The plant runs in self-consumption to cut the bill and the peak demand. Estimated production ≈ 1,121 MWh/year (1,600 kWh/kWp), avoiding ≈ 785 t of CO₂ per year.

700.6 kWp≈ 1121 MWh/yr≈ 785 t CO₂/yr
View project →

Our Installations in Video

Watch real installations carried out by our teams across Morocco.

Agricultural

Marrakesh Agro-Solar

Industrial

Tangier Industry Hub

Residential

Bouskoura Smart Villa

Industrial

Meknes Production Unit

Maroc
  • Bouskoura
    15 kW On-Grid System (battery-ready) – Bouskoura
    Date: 2026

    Grid-tied system in Bouskoura: 24 Jinko 620 W panels (14.88 kWp) on a Deye 15 kW hybrid inverter running in on-grid mode, ready for future battery storage. Estimated production ≈ 24.6 MWh/year (1,650 kWh/kWp), avoiding ≈ 17.2 t of CO₂ per year.

    14.88 kWp≈ 24.6 MWh/yr≈ 17.2 t CO₂/yr
    View project →
  • Safi
    On-Grid Solar System: 60 kW
    Date: December 2023

    Grid-tied photovoltaic installation for a commercial premises in Safi: 110 Jinko 550 W modules (60.5 kWp) on a Huawei SUN2000-50KTL-M3 inverter. Estimated production ≈ 99.8 MWh/year (1,650 kWh/kWp), avoiding ≈ 69.9 t of CO₂ per year.

    60.5 kWp≈ 99.8 MWh/yr≈ 69.9 t CO₂/yr
    View project →
  • Marrakech
    OFF-GRID: 16 kW
    Date: February 2023

    Remote site in the Marrakech region with no grid connection: 30 × 545 W modules (16.35 kWp) on a Deye 16 kW hybrid inverter in off-grid mode, with a bank of 4 lithium batteries of 5.12 kWh (20.5 kWh). Estimated production ≈ 27.8 MWh/year (1,700 kWh/kWp), avoiding ≈ 19.5 t of CO₂ per year.

    16.35 kWp≈ 27.8 MWh/yr≈ 19.5 t CO₂/yr
    View project →